HAL Group Inc. was engaged by 407 ETR Concession Company Limited to carry out detailed condition surveys of three critical structures on Highway 407, with a combined deck area of about 24,000 m².
STRUCTURES SURVEYED
Dundas Street over Highway 407 (MTO Site No. 10-477-1993), and the eastbound and westbound Highway 407 bridges over CN MacMillan Yard (MTO Site Nos. 37-1317-1-1995 and 37-1317-2-1995).
ADVANCED NON-DESTRUCTIVE TESTING
Ground-penetrating radar and ultrasonic testing were used alongside visual inspection to find hidden defects such as internal cracking and reinforcement corrosion.
PRIORITIZED REPAIRS
Deficiencies were categorized by urgency so that critical items could be addressed first and preventive maintenance planned to extend service life.
SAFE, COORDINATED FIELDWORK
Inspections were planned and coordinated with stakeholders to work safely on a high-volume highway corridor carrying heavy truck traffic.
EARLIER 407 ETR WORK
HAL previously completed limited condition surveys of four other 407 ETR structures, including the Highway 407 underpasses at Airport Road and Mississauga Road.