PROJECTS
HAL professionals are trusted by clients across diverse markets and industries to attentively listen to their needs, explore all available options, and craft solutions that add tangible value. Our engineers and materials scientists bring a wealth of collective expertise to each project, enriched by insights gleaned from past investigations. With a proven track record, we've likely encountered similar challenges in the past. And if not, our team is uniquely positioned to pioneer innovative, technically robust solutions, setting new standards in the industry.
CIBC Square | MTO | LaSalle Causeway Bascule Bridge |
---|---|---|
Toronto Pearson Airport | Toronto Pearson Airport | German Mills Culvert |
MTO Hwy 401 | MTO | City of Toronto |
Pumping Station | CLE Ottawa | LaSalle Causeway Bascule Bridge’s concrete counterweight. |
HAL carried out investigation of a 2700mm Combined Sewer at Logan Ave and Dundas St E, Toronto under | Gardiner | Township of Severn |
Prairie Siding Bridge | 2020-07-14 12.09.18 | Archie Duckworth Bridge |
Bailey Creek Bridge | Imperial Oil |
Greater Toronto Airports Authority (GTAA)
HAL carried out Visual condition survey of all airside and groundside bridges (76 structures) at Toronto Pearson International Airport (GTAA)
MTO ASSIGNMENT 2020-E- 0053
Detailed Bridge Conditions Surveys of nineteen (19) Bridges and three (3) culverts, various locations across HWY 1, 400, 401, 403, 410 AND 427 for MTO Central Region
City of Toronto 2021 Program
RFP No. 2984378200 /RFP-21ECS-TI-01GE- Detailed Condition Survey of seven (7) Bridges and Condition Assessment of sixteen (16) Retaining Walls and Noise Walls at the section of the F. G. Gardiner Expressway from HWY427 to Humber River for City of Toronto
LaSalle Causeway Bascule Bridge
HAL was retained by WSP on behalf of PSPC to carry out detailed investigation including full depth coring (3m deep) of LaSalle Causeway Bascule Bridge’s concrete counterweight.
2700mm Combined Sewer
HAL carried out investigation of a 2700mm Combined Sewer at Logan Ave and Dundas St E, Toronto under Metrolinx tracks.
Client : Hatch Ltd. for Metrolinx
CONCRETE IMAGING AND INSPECTION
HAL was retained by Crosslinx Transit Solutions (CTS) to carried out identifying complex reinforcement placement and rebar covers using ground penetrating radar (GPR)
ROTARY POOL INVESTIGATION
HAL was retained by Stantec on behalf of City of Oshawa to carry out a detailed condition survey of the outdoor pool tank at the property known as Rotary Pool located in Oshawa, Ontario.
MTO ASSIGNMENT: 2019-E-0007
Detailed Bridge Condition Surveys, Various Locations along Hwy 401.
Assignment Number: 2019-E-0007
MTO Central Region
BAYVIEW AVENUE BRIDGE
Detailed condition survey
of the Bayview Avenue Bridge over Don River (ID 285).
The bridge is an eight-span twin structure (total deck area 7800 square meters).
City of Toronto
​MTO EAST REGION: 4019-E-0008
Detailed Bridge Deck Conditions Surveys of 11 Bridges in MTO Eastern Region, four (4) in East Area and seven (7) in the West Area.
BRIDGES AND CULVERTS OSIM INSPECTIONS
WSP retained HAL on behalf of City of Markham to undertake Detail Visual Inspection (DVI) and CCTV inspection of 359 structures under the Bridges and Culverts Inspection Program for the next 3 years (2019, 2020 and 2021). As part of the inspection program, a total of 110 structures will be inspected in 2019, 119 in 2020 and 130 in 2021) and Inspection Program for the next 3 years (2022, 2023 and 2024) -Ongoing
CIBC SQUARE AT 81 BAY STREET
WSP retained HAL on behalf of Hines to provide shotcrete quality assurance and testing including hammer sounding of shotcrete surfaces over wall zones and headers with a hammer to detect hollow sections.