top of page
2020-10-11 11.15_edited.jpg
City Road
20221108_112601.jpg

PROJECTS

HAL professionals are trusted by clients across diverse markets and industries to attentively listen to their needs, explore all available options, and craft solutions that add tangible value. Our engineers and materials scientists bring a wealth of collective expertise to each project, enriched by insights gleaned from past investigations. With a proven track record, we've likely encountered similar challenges in the past. And if not, our team is uniquely positioned to pioneer innovative, technically robust solutions, setting new standards in the industry.

CIBC Square

CIBC Square

MTO

MTO

LaSalle Causeway Bascule Bridge

LaSalle Causeway Bascule Bridge

Toronto Pearson Airport

Toronto Pearson Airport

Toronto Pearson Airport

Toronto Pearson Airport

German  Mills Culvert

German Mills Culvert

MTO Hwy 401

MTO Hwy 401

MTO

MTO

City of Toronto

City of Toronto

Pumping Station

Pumping Station

CLE Ottawa

CLE Ottawa

LaSalle Causeway Bascule Bridge’s concrete counterweight.

LaSalle Causeway Bascule Bridge’s concrete counterweight.

HAL carried out investigation of a 2700mm Combined Sewer at Logan Ave and Dundas St E, Toronto under

HAL carried out investigation of a 2700mm Combined Sewer at Logan Ave and Dundas St E, Toronto under

Gardiner

Gardiner

Township of Severn

Township of Severn

Prairie Siding Bridge

Prairie Siding Bridge

2020-07-14 12.09.18

2020-07-14 12.09.18

Archie Duckworth Bridge

Archie Duckworth Bridge

Bailey Creek Bridge

Bailey Creek Bridge

Imperial Oil

Imperial Oil

Toronto Pearson Airport

Greater Toronto Airports Authority (GTAA) 

 HAL carried out Visual condition survey of all airside and groundside bridges (76 structures) at Toronto Pearson International Airport (GTAA)

2021-09-07 11.12.54.jpg

MTO ASSIGNMENT  2020-E- 0053

Detailed Bridge Conditions Surveys of nineteen (19) Bridges and three (3) culverts, various locations across HWY 1, 400, 401, 403, 410 AND 427 for MTO Central Region 

2021-09-13 22.32.36.jpg

City of Toronto 2021 Program 

RFP No. 2984378200 /RFP-21ECS-TI-01GE- Detailed Condition Survey of seven (7) Bridges and Condition Assessment of sixteen (16) Retaining Walls and Noise Walls at the section of the F. G. Gardiner Expressway from HWY427 to Humber River for City of Toronto 

2020-10-10 22.54.53.jpg

LaSalle Causeway Bascule Bridge

HAL was retained by WSP on behalf of PSPC to carry out detailed investigation including full depth coring (3m deep) of LaSalle Causeway Bascule Bridge’s concrete counterweight.

20221108_112601.jpg

2700mm Combined Sewer 

HAL carried out investigation of a 2700mm Combined Sewer at Logan Ave and Dundas St E, Toronto under Metrolinx tracks.

 

Client : Hatch Ltd. for Metrolinx

2020-07-14 12.09.18.jpg

CONCRETE IMAGING AND INSPECTION

HAL was retained by Crosslinx Transit Solutions (CTS) to carried out identifying complex reinforcement placement and rebar covers using ground penetrating radar (GPR)  

2020-01-16 12.57.04.jpg

ROTARY POOL INVESTIGATION

HAL was retained by Stantec on behalf of City of Oshawa to carry out a detailed condition survey of the outdoor pool tank at the property known as Rotary Pool located in Oshawa, Ontario.

123.jpg

MTO ASSIGNMENT: 2019-E-0007

Detailed Bridge Condition Surveys, Various Locations along Hwy 401.
Assignment Number: 2019-E-0007
MTO Central Region 

P1270845.JPG

BAYVIEW AVENUE BRIDGE

Detailed condition survey 
of the Bayview Avenue Bridge over Don River (ID 285).
The bridge is an eight-span twin structure (total deck area 7800 square meters).

City of Toronto
 

IMG_2948.JPG

​MTO EAST REGION: 4019-E-0008

Detailed Bridge Deck Conditions Surveys of 11 Bridges in MTO Eastern Region, four (4) in East Area and seven (7) in the West Area. 

IMG_1172.JPG

BRIDGES AND CULVERTS OSIM INSPECTIONS       

WSP retained HAL on behalf of City of Markham to undertake Detail Visual Inspection (DVI) and CCTV inspection of 359 structures under the Bridges and Culverts Inspection Program for the next 3 years (2019, 2020 and 2021). As part of the inspection program, a total of 110 structures will be inspected in 2019, 119 in 2020 and 130 in 2021) and Inspection Program for the next 3 years (2022, 2023 and 2024) -Ongoing 

Untitled_Panorama1.jpg

CIBC SQUARE AT 81 BAY STREET     

WSP retained HAL on behalf of Hines to provide shotcrete quality assurance and testing including hammer sounding of shotcrete surfaces over wall zones and headers with a hammer to detect hollow sections.

bottom of page