top of page
TTC Condition Survey.jpg

 

 

HAL Group Inc. was retained by Parsons on behalf of the Toronto Transit Commission (TTC) to carry out detailed condition surveys of rail-carrying bridges along Highway 401, including Bridges 8, 13, 17 and 20 at the Allen Road and Highway 401 interchange.

​

DETAILED CONDITION SURVEYS

​

Between 2020 and 2024, HAL surveyed eight rail-carrying bridges along Highway 401, providing condition data to guide maintenance and repair planning.

​

EMERGENCY INSPECTIONS

​

In 2023 and 2024, HAL carried out emergency inspections in response to concerns about loose concrete, recommending its removal to keep the travelling public safe.

​

TRAFFIC SAFETY

​

Robust traffic control allowed the inspections to proceed safely over Highway 401 while protecting both workers and motorists.

​

STAKEHOLDER COORDINATION

​

The work was coordinated closely with Parsons, the TTC and other authorities to keep transit and highway operations running safely.

TTC Highway 401 / Allen Road: Condition Surveys of Rail-Carrying Bridges

OTHER PROJECTS

bottom of page