Clients: 481 Uni Investments Inc., with EllisDon as contractor
Location: 481 University Avenue, Toronto, Ontario
Completed: 2025
Services: Mass concrete temperature monitoring, construction quality assurance, reporting
The Level 11 transfer slab at 481 University Avenue carries the tower above it, and it was placed as mass concrete. In a pour that thick, the heat of hydration can open up a damaging temperature difference between the core and the surface. HAL provided real-time temperature monitoring of each pour through the curing period.
WHAT HAL DID
For each pour, HAL installed wireless data loggers with multi-depth probes 1.5 m, 3 m and 4.5 m long. Sensors were placed at the top, middle and bottom at the centre of the placement, and at the top and middle at two edge locations, with ambient temperature logged as well. The data was recorded continuously and was available remotely to the project team throughout curing.
WHY IT MATTERS
If the temperature difference between the core and the surface of a mass pour gets too large, thermal cracking can compromise durability and structural performance, and on a transfer slab the stakes are high. Live data lets the contractor adjust insulation and curing measures before a limit is exceeded, not after.
OUTCOME
The project team had a documented temperature record for each pour, showing compliance with the temperature-differential and curing requirements, and HAL issued a letter report.