​Clients: The Regional Municipality of Niagara (Crystal Beach digester); HATCH Ltd., for Metrolinx (combined sewer); WSP, for the City of Markham (Unionville reservoir); AECOM, for the Region of Peel (valve chamber); Stantec, for the Regional Municipality of Halton (Bronte Creek Aqueduct)

Location: Crystal Beach, Ontario; Logan Avenue and Dundas Street East, Toronto; Unionville (Markham); Mississauga; Burlington, Ontario

Services: Delamination surveys, corrosion potential testing, concrete coring, steel liner exposure, laboratory and petrographic testing, confined space work, rope access

​

Water and wastewater structures face aggressive conditions and are hard to reach. HAL has assessed a range of them, from a primary digester and a large combined sewer beneath a rail corridor to an abandoned reservoir, a buried valve chamber and a watermain bridge over Bronte Creek.

​

CRYSTAL BEACH PRIMARY DIGESTER (NIAGARA REGION)

​

HAL carried out a delamination survey of the digester walls and floor, corrosion potential testing, and coring, with laboratory testing for compressive strength, chloride content and carbonation. The results gave the Region reliable data for asset management and rehabilitation planning.

​

COMBINED SEWER UNDER THE METROLINX CORRIDOR (HATCH)

​

At a 2700 mm combined sewer near Logan Avenue and Dundas Street East, HAL extracted ten cores, exposed the steel liner at eight locations to check for corrosion and measure mortar and shotcrete thickness, and had the cores tested for petrography, pH, sulphate attack and compressive strength. All work was in a confined space with a rescue team on site, and Toronto Water arranged temporary flow diversion for safe access.

​

UNIONVILLE RESERVOIR (WSP, FOR THE CITY OF MARKHAM, 2024)

​

HAL carried out a limited condition survey of an abandoned underground reservoir, built around 1967, beneath the Unionville Millennium Bandstand. The three-chamber structure, about 855 m² in plan and 6 m high, was mapped for wet areas, cracking, spalls and delamination on the walls, soffit, columns and floor, with CAD drawings of each chamber.

​

PEEL REGION VALVE CHAMBER (AECOM, 2024)

​

At a Region of Peel valve chamber on Erin Mills Parkway at Battleford Road in Mississauga, HAL scanned all four walls with GPR, which found no reinforcement, and extracted cores for compressive strength testing.

​

BRONTE CREEK AQUEDUCT (STANTEC, FOR HALTON REGION, 2021–2022)

​

For Stantec, HAL carried out a limited condition survey of the Dundas watermain bridge (aqueduct) over Bronte Creek in Burlington, following the SRM and OSIM. A rope-access team surveyed all five piers for delamination and deterioration, the top of the deck was sounded, the abutments were inspected from ladders and the girders from the ground, and cores from the piers were tested for compressive strength.

​

WHY IT MATTERS

​

Field data combined with laboratory testing shows not just what the concrete looks like, but how durable it will be: the basis for repair-or-replace decisions on critical infrastructure.

​

NEED A SIMILAR INVESTIGATION?

​

HAL can scope it with you, from the site visit to the final report. Request a proposal