Clients: Trillium Rail Partners (Eglinton West shaft sites); Trillium Rail Partners and Alberici (Fergy Brown maintenance shed); Mammoet, for Hydro One (transformer move); WSP (bridges over the CN corridor); Stantec, for Enbridge (Parliament Street Bridge); PACT, on behalf of the GTAA (Toronto Pearson); Kings Valley Paving (paving work)

Location: Greater Toronto Area, Ontario

Completed: 2021 to present

Services: Pre- and post-construction condition surveys, crack and defect mapping, date- and time-stamped photo and video records, key plans, CAD defect drawings

​

Excavation, shoring, piling and heavy loads can move the ground and the structures around them. A pre-construction survey records what was already there, so any later change can be told apart from existing damage, and claims can be settled quickly and fairly. HAL carries out these surveys for contractors and owners on transit, rail, highway, airport and private projects, and returns after construction to document the same areas again.

​

EGLINTON WEST SHAFT SITES (TRILLIUM RAIL PARTNERS, 2025–2026)

​

For Trillium Rail Partners on the Eglinton West extension, HAL is surveying the zones of influence around five shaft and traction power sites between Royal York Road and the Highway 401 / Renforth area, about 32,300 m² in total. The survey limits cross Eglinton Avenue West, the Highway 427 and Highway 401 ramps, the Mississauga Transitway and residential frontages. Pavements, curbs, barriers, retaining walls, utilities and building exteriors are documented with time-stamped photographs and video, and the Transitway overpass substructure is mapped in CAD, with cracks 0.3 mm and wider recorded. Earlier, HAL completed pre- and post-construction surveys at the Fergy Brown maintenance shed site for Trillium Rail Partners and Alberici.

​

TRANSFORMER MOVE OVER A TTC TUNNEL (MAMMOET, 2022)

​

Before a Hydro One transformer delivery by Mammoet crossed over the TTC tunnel at Bay Street near Lake Shore Boulevard, HAL inspected the tunnel soffit and walls at arm's reach, measured existing crack widths and mapped deterioration. HAL returned after the move to repeat the inspection, issuing a pre-move report in August 2022 and post-move reports in October and November 2022.

​

SIX STRUCTURES ON THE CN CORRIDOR (WSP, 2023–2024)

​

For WSP, HAL carried out pre-construction surveys of six structures over and under the CN corridor: the High Tech Road Bridge, the Regional Road 7 CNR Overpass, the Highway 407 eastbound and westbound bridges over the CN Bala Subdivision, the German Mills culvert and the Bantry bridge. Following the MTO Structure Rehabilitation Manual and OSIM, each structure received a detailed visual inspection, delamination sounding of accessible areas, crack and defect drawings and a photo appendix.

​

PARLIAMENT STREET BRIDGE (STANTEC AND ENBRIDGE, 2023)

​

Pre- and post-construction visual condition surveys of the Parliament Street Bridge over the rail corridor in downtown Toronto, carried out for Stantec on behalf of Enbridge.

​

TORONTO PEARSON (PACT, ON BEHALF OF THE GTAA, 2025–2026)

​

For PACT, on behalf of the Greater Toronto Airports Authority, HAL has surveyed about a dozen work areas at Toronto Pearson ahead of construction, including hangar and hardstand areas, a duct bank route, building surroundings and a yard off Britannia Road East.

​

PAVING AND RESIDENTIAL SURVEYS (2026)

​

Pre- and post-construction surveys of homes, driveways and frontages next to paving and construction work, for Kings Valley Paving and other contractors.

​

WHY IT MATTERS

​

A documented baseline protects everyone. The contractor can show what was already there, owners and neighbours know their property was recorded, and any claim can be resolved from evidence instead of memory. For the largest example of this work, see the Pape Tunnel and Underground Stations project, where HAL surveyed 658 structures before and after construction.

​

STARTING WORK NEAR EXISTING STRUCTURES?

​

HAL can document the baseline before you mobilize and return when the work is done. Request a proposal