​Clients: GHD (Highway 40, Sarnia) and WSP (Montrose Road Bridge, Niagara Falls)

Location: Sarnia and Niagara Falls, Ontario

Completed: 2024 and 2025

Services: GPR scanning, full-depth deck coring, daily lane reinstatement, permanent repair design, condition surveys

​

Geotechnical engineers sometimes need a borehole where the only access is straight through a live bridge deck. HAL provides that access. We locate the reinforcement, cut a full-depth core through the deck slab, keep the lane open to traffic between drilling days, and then permanently repair the hole to a stamped design using an MTO-approved repair method. We’ve done this for GHD on Highway 40 in Sarnia and for WSP on the Montrose Road Bridge in Niagara Falls.

​

WHY DRILL THROUGH THE DECK

​

When a bridge is being widened, replaced or rehabilitated, the most valuable soil and rock information is usually at the centre spans, right beside the pier foundations where the bridge carries its loads into the ground. Those are exactly the spots a drill rig can’t normally reach. Railway tracks, rivers, highways or steep valleys sit under the span, and getting a rig down there would mean track outages, work in the water, or lane closures below, if it’s possible at all. That is why boreholes have traditionally been drilled at the approaches, and the foundation design near the piers has had to rely on extrapolated data.

​

Coring through the deck changes that. The rig works from the bridge itself and drills directly above the pier foundation, so the geotechnical team gets borehole data exactly where the design needs it, with nothing disrupted below.

​

WHAT HAL DID

​

  • Highway 40 (Modeland Road) Bridge over CNR, Sarnia. For GHD on MTO’s Highway 40 Widening, September 2024. HAL cut one 8-inch full-depth core through the deck for borehole BH22-04, with live CN tracks below.

  • Montrose Road Bridge (Bridge 098240), Niagara Falls. For WSP and the Regional Municipality of Niagara, September 2025. HAL cut full-depth cores through the deck for the drilling program. HAL also completed pre- and post-drilling condition surveys of the bridge, on September 15 and September 26.

​

HOW IT WORKS

​

  • GPR scan to locate the rebar, so the core can be placed between bars.

  • Steel plate and cold-mix asphalt over the hole each day, so the lane can reopen.

  • Permanent repair to HAL’s stamped design, using an MTO-approved repair method, completed from the deck without needing access to the bridge underside.

​

OUTCOME

​

Both drilling programs got the boreholes they needed through the bridge deck, each core location was permanently repaired, and on Montrose Road the bridge condition was documented before and after drilling.

​

NEED ACCESS THROUGH A BRIDGE DECK?

​

HAL can scope it with you, from the site visit to the final report. Request a proposal

Bridge Deck Coring for Drilling: Full-Depth Access Through Live Bridge Decks